Description
SC-CK818 thoracic cavity closed drainage training manikin adopts a slope supine position and is supported by a special bracket. This training model is a kind of clinical training manikin produced in a standardized patient model, contains accurate anatomy, is realistic in shape, and feels real to the touch. SC-CK818 thoracic cavity closed drainage training manikins are all made of advanced PVC raw materials. The products produced from this material will not be easily deformed and damaged, and have a long service life.
Item | Specification |
Model | SC-CK818 |
Name | Thoracic cavity closed drainage training manikin |
Material | PVC |
Warranty | 1 year |
Certificate | ISO9001/ISO14001 |
| Features of SC-CK818 Thoracic Cavity Closed Drainage Training Manikin
- The electronic standardized patient takes slope decubitus, texture soft, feel real, image lifelike appearance.
- The anatomical structure is accurate. The clavicle, sternum, the gap between the frame, and rib can be touched.
- With a mechanical breathing device. The electronic standardized patient has spontaneous breathing, chest, and abdominal breathing movements.
- Possible postoperative drainage tube nursing training. (Double side) Collarbone midline between the front rib, 2 (double side) axillary or axillary at the front line between the fifth rib, respectively implemented drainage tube placement, and visible sealed bottle inside liquid level fluctuates up and down with the breath.
| Applications of SC-CK818 Thoracic Cavity Closed Drainage Training Manikin
SC-CK818 thoracic cavity closed drainage training manikin is mainly used for medical clinical training. Hospitals, medical schools, and some clinical training institutions need such products. The main training is proficiency in multiple thoracic closed drainages for medical students and medical staff.
| Package & Shipment
- We use neutral carton packaging without any logo.
- If there is stock, the delivery time is one week. If there is no stock, it will take about 15 working days.
- Our company mainly adopts the T/T payment method, and we need to receive the full payment before we can deliver the goods.
- The transportation method of the product supports express delivery, sea transportation, and air transportation.